Saturday, August 9, 2008
Good Weather For Ducks
All of the rain hasn't caused much damage here at our place. We did have some damage on the class four road which leads to our cabin but the town brought in some gravel a few days ago and patched it up. Other towns near by have lost entire roads due to the rain and have applied for disaster relief.
I had one exciting evening a couple of weeks ago when we had a heavy downpour. I was sitting upstairs on a Sunday afternoon playing my guitar and happened to look out to check on the dogs and there was a river running right down the center of the dog yard! The dogs were all sitting on their deck watching the river flow. I jumped up and into my rain gear and ran out to the yard in a panic. I had visions of all of the sand which I had moved into the yard by wheel barrow washing down the river. All that work gone in the matter of a few minutes... What had happened was the curtain drain which I had dug at the top of the dog yard had over flowed. The spring on the hillside above which usually only runs in the spring with the heavy snow melt had begun to flow and filled the foot and a half deep ditch. When I dug the ditch with the excavator I hadn't quite gotten through the bank to the stream so it wasn't draining like it should. I spent the next half hour digging with the pick ax until I had cut another five feet through the bank and then the water began to drain and run away from the dog yard. Once I got the water out it wasn't as bad as I had thought. Only a little of the sand actually left the dog yard. Much of it was just moved around and with some raking it was almost as good as new. I suppose it was a good test for my ditch. If we made it through that heavy rain it will probably be fine next spring with the normal run off.
That was the big excitement since my last post. Otherwise things seem to drain pretty well on our hillside. The garden is growing like crazy and we've got tons of cucumber, squash, peas and greens. There are plenty of green tomatoes but we'll have to wait and see if we get enough warm weather for them to ripen.
As August quickly slips by my thoughts are quickly turning to fall dog training. Last year we started running with the carts around mid September. That's only a few weeks away! I've really missed not running the dogs this summer.
Until next time.
Friday, July 11, 2008
Summer 2008 Dog Yard Renovations
A bonus to this set up is that for our town a building permit is not required for structures under eight foot square. The doggie condos are basically glorified dog houses.
Step one: Preparing the actual yard and improving the drainage issues. I rented a mini excavator to level the yard out so the doggie condos would sit flatter and along the same plane. We had four or five stumps in the yard which had always made it difficult to place tether posts. The excavator made short work of those! I also dug a four foot deep curtain drain across the back side of the yard to pull away and water that might come down the slope. I then had thirty five yards of sand delivered which I spread through the newly leveled side of the yard. I had filled another section of the yard with sand last summer and was very happy with the drainage and lack of mud. This is a picture of the yard leveled; evenly spaced tethers and new layer of sand.
Step two: Building the decks. I put together a lumber order and had it delivered and unloaded in our driveway which would become the doggie condo construction shop for the next two weeks. I built the units so the roof could be separate making them much easier to move. Here we are framing the decks in the driveway.
Moving the decks into the dog yard so that cars can once again pass through the driveway. The deck seem to be a immediate hit with the dogs!
The decks in place in the dog yard.
Step three: The driveway becomes a roof assembly line. These projects always seem to take on a life of their own. When I put the first metal roof on I had the bright idea of painting it to see how it would look. Well with one painted they all would need to be painted in order to match. Some of the metal had rust on it so of course that needed to be wire brushed off before painting. Before I knew it we had another two hours of labor per roof. I think the final result was worth the time though and it should help the metal last longer.
Now we are almost done. All of the roofs are on, my wife says she thinks it looks like a state park... I still need to buy 50 cinder blocks to block the corners of the decks up off the ground then do the final leveling and I think that will be it for this summer. The doggy condos seem to be working out very well. We had a rainy day this past week and we had multiple places to stay dry while hanging out with the dogs. I can’t wait for winter to see how they work with snow!

Monday, May 26, 2008
Officially Spring
I built a pair of lean too structures for the dog yard last week as prototypes and they seem to be working well. Now all I have to do is build twelve more! I don't have roofing on them yet but I did find a great deal on a load of used roofing. All I have to do is pick it up this week. The pups got a new swimming pool this week too. They've been upgraded from a four foot kiddie pool to a six foot. I'm really excited about the improvements that I'm making this summer. It will really polish things up.
That's about all the news that's fit to print from here in Lake Elmore today. Until next time!